The
following is the Request for Proposals released on March 8, 2010.
A Model
Assisted Living Community
Request for Proposals
For:
Development
of public land along
the Truman Waterfront under long-term lease to Florida Keys Assisted
Care
Coalition, Inc. (“FKACC”)
March 8, 2010
TABLE OF CONTENTS
Part I - Advertisement: Request for Proposals (RFP)
Part II - Overview and
Project Information
Part III - Submittal
Requirements
Part IV - Evaluation
Criteria
Part V - Terms and
Conditions
Exhibits
PART
I -
ADVERTISEMENT: REQUEST FOR PROPOSALS (RFP)
RFP Issue Date: March 8, 2010
RFP Due Date: Proposals
must be received before 2:00 PM on July
12, 2010.
A MANDATORY site visit
and pre-proposal conference will be
held at 2:00 P.M. on
April 21, 2010, in the
Florida Keys Eco-Discovery Center Meeting Room, 35 E. Quay Rd., Key
West,
Florida.
Proposals must be
delivered to FKACC at 201 Front St., Suite
224, Key West, Florida 33040 or mailed to FKACC to the attention of
Sandra
Higgs, P.O. Box 1008, Key West, Florida, 33041-1008.
Only hard copy proposals
will be accepted. FKACC will not be
responsible for any delays in delivery of proposals. Proposals must be
clearly
identified on the outside of the envelope as:
• RFP
• Florida Keys Assisted
Care Coalition, Inc.
• Master Developer
Proposal
• Attention: Sandra Higgs
• From: (Proposing Firm
name)
The complete Request for
Proposals will be posted on FKACC’s
website, www.fkacc.org
. Addenda and other
information will be posted on the website throughout the solicitation
process.
Proposing firms are
encouraged to monitor the website
throughout the solicitation process.
FKACC encourages
participation of minority/women business
enterprises and subcontractors.
Questions
are to be
directed to Sandra Higgs, Coordinator, via e-mail to fkacc99@aol.com .
Please review the
information on the website prior to submitting questions.
PART
II - OVERVIEW
AND PROJECT INFORMATION
FKACC, a not-for-profit
501(c) (3) corporation, seeks a
Master Developer to sub-lease and develop two parcels of public land
(one owned
by The City of Key West; the other by The Utility Board of the City of
Key
West) comprising approximately 5.5 acres of land on and adjacent to
former Navy
property at Truman Annex, as a retirement community consisting of
approximately
95-100 independent living units and 40 assisted living units.
This project represents a
significant opportunity for a
Master Developer to design, build and operate a 140 unit housing
facility in
Key West, on land that the voters of Key West have approved to be
leased to
FKACC, and contiguous land owned by Keys Energy Services, with
substantial
benefits for the Master Developer, FKACC, the greater Key West area,
and Monroe
County. FKACC
seeks to partner with
select, private businesses and/or not-for-profit organizations to
create and
operate this retirement community.
This project is envisioned to advance the retirement-housing
objectives of FKACC, the business objectives of the partners, and the needs of
elder residents of the greater Key West area.
The project will provide vitally-needed retirement housing through a
financially-sound mixed-income model designed for the various financial
segments of retirement-age Keys’ residents who do not require full-time nursing
care. Accordingly, private businesses must
balance their business model with the FKACC mission, as more fully set forth
below. The Master Developer will be expected
to support FKACC’s Guiding Principles for the project (please refer to Exhibit
A to this RFP).
FKACC
The mission of the FKACC is to provide a model assisted
living community in harmony with the Keys environment and fully integrated
within the surrounding community. In
carrying out that mission, FKACC raised
funds for planning the project, identified a suitable site, obtained Utility Board and City of Key West dedication
of the land needed for the project, retained a consultant experienced in creation
and operation of elder-care communities
to produce a feasibility and marketing study,
and secured voter approval of a referendum authorizing the City of Key
West to enter into a 99-year lease of City-owned land for the planned
retirement community. Please refer to FKACC’s web-site, www.fkacc.org, for additional information
about FKACC.
Project Site
The retirement community will be located on two contiguous
parcels of land totaling approximately 5.5 acres. The City parcel consists of approximately 4
acres of vacant land located on the former U.S. Navy Truman Annex. The Utility Board parcel consists of
approximately 1.5 acres of land occupied by historic masonry buildings,
formerly housing electric generating equipment, located East of the City
parcel, between Angela and Geraldine Streets, on the Westerly perimeter of the
historic Bahama Village community. Both
parcels are indicated on the map entitled “Truman Waterfront Key West, FL
Assisted Living Site Plan”, attached as Exhibit B [note: City parcel is
outlined in dark black line; Utility Board parcel is marked “KES”, referring to
Keys Energy Services].
Existing buildings
(Utility Board parcel)
The masonry buildings located on the Utility Board parcel
are historic structures that formerly housed industrial equipment. The
preservation, rehabilitation and reuse of these buildings are an integral part
of the project. The Master Developer
will coordinate those efforts with the Historical Architectural Review
Commission (“HARC”).
Site Conditions
The Master
Developer(s) will be responsible for determining the environmental conditions,
geotechnical conditions, utility availability, storm water management plan,
applicable land use regulations, and ensuring compliance of the development
with any applicable land use, concurrency and other regulations. Site
development must accommodate the existing sewer and Navy water lines running
through the City parcel. Additional site
information is included in the RFP Exhibits.
Partnership
objectives
FKACC’s objective is to establish a mixed income Key West
retirement community providing quality
housing and related services for retirement-age Keys’ residents who may require
some assistance or care, short of full-time nursing care. The need for assisted-living
housing was demonstrated by an independent market study, attached hereto as
Exhibit D. To meet that need, FKACC
proposes a mix of 90-110 independent living units and 40-50 assisted living
units, allocated among low-moderate income and market-rate rentals, and fixed
price leases for some independent living apartments, with a return (optimally
80%) upon departure by the lessees. FKACC will serve as the sponsor of this
community, coordinating the public and private efforts necessary to plan,
finance, and build the project. FKACC
anticipates that most of the estimated construction cost will be funded by
Senior Living Revenue Bonds. The
Master Developer’s ability to embrace FKACC’s mission will be a significant factor
in the selection process ancillary benefit to this project. It is not FKACC’s
intent to change the private business model to the extent that the housing
could not operate in a financially successful manner.
Parking
The ability of FKACC to provide adequate parking for
residents was identified in the market study as an important element of the
project. The Master Developer must identify
the number and location of parking spaces on the site plan submitted as part of
the response to this Request.
Lease
The Property will be subleased to a Master Developer under a
triple-net lease, the terms of which will be negotiated among the public owners
(City and Utility Board), FKACC and the Master Developer. The term of the sublease
should be assumed to be between 25 and 50 years. The sub-lessee will be responsible for all
costs and expenses arising from the use, operation, maintenance or occupancy of
the property, including any applicable property taxes and insurance costs. The
Master Developer must provide a detailed exit strategy at the end of the
sublease term.
Development Teams
Proposing firms may comprise teams or joint ventures, will
be known as (“Responding Teams”), and may include subcontractors as needed, in
order to assemble the expertise requested for this project. Prior experience in
operating elder housing is a major factor in determining the qualifications of
the proposing firm
PART III - SUBMITTAL
REQUIREMENTS
Proposal Format
Submissions are to be organized in the order the “Submittal
Materials” are set forth herein, with each section and item number labeled and
tabbed to identify the submittal item for which the information is being
presented. Proposing firms are cautioned to be full and complete in their
responses, without being overly elaborate. Supporting materials, brochures,
etc. are to relate to a specific section, and be included in the applicable
section. Proposing firms are requested not to submit supporting information
that is not applicable to a specific submittal requested. Submissions should
include information sufficient to provide for analysis relative to the
submittals requested and corresponding evaluation criteria described in this
Request for Proposals.
RFP – Number of
Copies and Size
Hard copies of the RFP response must be submitted. One
original, so marked, and fifteen (15) copies of the proposal are to be
submitted. A copy must
also be submitted in electronic format on a CD; the
format shall be
in Microsoft Word and the file saved in PDF. Each
copy is to include all materials requested, as there will be multiple parties
reviewing the submittals. The proposal may not exceed seventy-five (75) 8 ½ x
11 total pages, line spacing will be at least 11/2 lines; the size of the font
shall be 12 points (footnotes at no less than 11 points and margins(left-hand,
right-hand, top, and bottom) shall be a minimum of 1 inch.
RFP Timeline
RFP Issued: March 8, 2010.
Pre-proposal conference:
April 21, 2010
Questions due: May 21, 2010
Proposals due: July 12, 2010
Evaluation of written submissions: July
22, 2010
Evaluation Committee meeting(s) to identify short-listed
firms: July 27, 2010
Presentations by short-listed firms: August
5, 2010
Evaluation Committee meeting(s): August 9, 2010
FKACC Board Workshop:
August 10, 2010
The following dates are
subject to adjustment, based on the decisions of the FKACC:
Discussions/negotiations of proposal with invited firm(s),
if needed: August 12 & 13, 2010
Evaluation Committee meeting(s): August 17, 2010
Best-And-Final Offers due from invited firm(s), if
needed: August 20, 2010
Evaluation of Best-And-Final Offers, if such Offers are requested: August 24, 2010
Evaluation Committee meeting(s), if needed: August 26, 2010
Presentation to FKACC Board of Trustees: August 27, 2010
Additional discussions/negotiations with invited firm(s), if
needed: August 30, 2010
Recommendation to City of Key West: August 31, 2010
Note: Discussions
with City or KES, and Evaluation Committee meetings, may be scheduled as needed
throughout the evaluation process.
Submittal Materials
The Proposal is to include the following information:
A) Master Developer’s
Relevant Experience
1. Similar Projects:
Describe responding team’s experience developing similar projects. Describe in
detail: a) your three most recent projects; b) your three most similar
projects; and c) at least one long-term project (i.e., greater than 3 years in operation). Delineate responding
team’s specific capabilities and past experience in master planning, designing,
constructing, owning, managing, leasing and underwriting housing projects with
similar goals to FKACC’s on this project.
2. Experience with
Public/Private Partnerships: Set forth
your project experience with public/private partnerships. Describe in
detail your experience working with local municipalities, institutions, or
public agencies. In addition, describe your firm’s experience with obtaining
public-sourced economic incentives on past projects.
3. Land Lease
Projects: Identify responding team’s experience with ground leases.
4. Local Familiarity:
Describe responding team’s prior experience with development projects in South
Florida. If you lack such experience, describe what actions you would take to
familiarize your team with the local market conditions, and particularly the
unique characteristics of the Keys.
5. References:
Provide one (1) client reference from each of the three (3) most similar
projects undertaken by your firm or members of the responding team. Identify
the contact information for each client reference’s most senior project
administrator. References should be able to describe the performance of the responding
team regarding understanding and meeting the goals of the client, cost control,
leasing, design and construction management, scheduling, and the overall
financial performance of the project.
B) Breadth and Depth
of Master Developer’s Services and Resources
1. Resources:
Describe your firm’s depth of resources, including a description of
professional staff in the region (or outside of the region that will be
available as resources to this project).
2. Services Available:
Describe the full range of services provided by your firm.
C) Proposed
Development Management Team
1. Responding Team
Personnel: Provide a separate resume for each person with a key role on
this project. Delineate for each key team member his/her years of experience,
history on projects of a similar nature, tenure with the firm, and area of
expertise. Be extremely clear and comprehensive regarding the person(s) who
will have primary, day-to-day project management responsibility.
2. Team Relationships:
Provide an organizational chart identifying the project team members who will
be assigned to this project.
3. Supporting Firms:
To the extent that your firm proposes to out-source any services, identify how
you will provide all required services to successfully complete this project.
If you propose to include third parties on your team, describe the relationship
between or among the firms, past project working experience, and qualifications
of such other firm(s), including individual team members.
4. Equal Opportunity:
Please refer to the Equal Opportunity information in PART V - TERMS AND
CONDITIONS OF THE RFP. Please provide
information about your firm’s non-discrimination employment policies.
D) Development
Management Approach
1. Guiding Principles:
Describe how your firm will meet FKACC’s mission and goals for the Retirement
Community Project.
2. Project Approach:
Describe how your firm will approach the overall management and marketing of
this project, addressing specific actions during each major phase. Discuss how
your firm will involve FKACC in the decision process.
3. Management Tools:
Describe the development management tools and systems that your firm uses with
similar projects (e.g., cost
accounting, budget management, scheduling, investment analysis, status
reporting, action item follow-up, project management, etc.)
4. Project Schedule:
Based upon your experience with similar projects, provide a schedule beginning
at the point of selection and addressing the following project phases:
negotiation of the sublease terms; design and permitting phase; construction
phase duration; and projected opening of the first and last housing units.
Describe your firm’s phasing and absorption plan.
5. Tenant Mix: Describe
your firm’s approach for ensuring that the occupancy mix (i.e., low-cost,
moderate and market rate) conforms to FKACC’s published description of the
project, as stated in “FKACC Responses to Frequently Asked Questions 8/21/07”
(Exhibit C)
6. Master Plan:
Provide an illustrative master plan of your proposed project. The master plan
is to be a color-rendered drawing clearly showing proposed building locations
and sizes, land uses, densities, access, storm water facilities, open space features, parking and phasing.
Include a chart on the master plan that identifies each building and indicates
proposed use, gross square footage, and phase. Also summarize parking by phase.
• Graphically depict connectivity
of the housing to other facilities within the project, and linkage with the
adjacent residential community. FKACC is seeking design harmony within the
project, and connectivity with the waterfront and the Truman Annex and Bahama
Village neighborhoods.
• The master plan shall be in an
11” by 17” foldout format included with the proposal. FKACC may
request a digital, PowerPoint,
and/or large-format hard copy of the master plan at a future date.
E) Sustainable
design.
The Florida Keys have the highest utility (particularly
water and electricity) costs in the State of Florida. Design features that reduce the project’s
demand for utilities are an essential component of the project. The proposal should specify those design
features and the anticipated level of LEEDS certification for the community’s
facilities.
F) Project Financing
Provide your firm’s proposed terms of the sublease and of
the residents’ rent/payment structure, addressing each of the following items:
1. Provide Primary Lease Term and Renewal Lease Terms (if
any).
2. Propose a Rent/payment structure that will produce
sufficient revenue (supplemented by any grant or private contributions obtained
by FKACC) to meet FKACC’s goal of a constant, predictable revenue stream
sufficient to meet bond obligations and operational costs.
3. Provide a clearly defined project schedule that will
provide Completion Dates and Occupancy Date(s) for each portion of the project.
State measures that your firm will take to ensure that the Occupancy Date(s) is
achieved.
4. Provide a breakdown of how the project will be funded
including:
4.1 Amount of external investment
(grants, private contributions) required
4.2 Amount of debt required
4.3 Sources of funds
5. Provide a condensed proforma for the project, addressing
your firm’s estimate of the development cost, operating and maintenance costs.
6. Describe your firm’s plan to address any revenue
shortfall during the sublease term, your firm’s strategy for fulfillment of the
sublease terms, and exit strategy at the end of sublease.
G) Additional
Features or Services
Provide information regarding any additional features,
services or concepts that differentiate your proposal and/or service abilities
from other providers. These should be features, services or concepts that do
not fit within any of the other submittal items but which would add additional
value or enhance the overall project or the relationship between the Master Developer
(s) and FKACC. These may be presented as part of the proposal or as optional
alternates.
H) Additional
Information and/or Clarifications
FKACC reserves the right to request additional information
and/or clarifications to supplement the original proposal submittal. Further,
FKACC may request supplemental written information to clarify verbal
presentations and interviews with the short-listed Master Developer(s). FKACC
reserves the right to waive irregularities and technicalities and to request re-submittals
or revised proposals.
Certification Form
Include with the Submittal Materials, a completed
Certification Form, in the format provided below:
Certification Form
Submitted by:
________________________________________
________________________________________
________________________________________
________________________________________
(Name and address of firm)
________________________________________
(Authorized Person’s signature)
________________________________________
(Printed/typed name of Authorized Person)
________________________________________
(Telephone number)
________________________________________
(Facsimile number)
________________________________________
(Email address for correspondence)
PART IV - EVALUATION
CRITERIA
It is FKACC’s intent to enter into a sublease contract with
the best overall Master Developer(s), as determined solely by FKACC.
Consideration will be given to written RFP responses and all supporting
information provided, the success of presentations and interviews with FKACC’s
representatives, and the financial considerations of the proposed development.
FKACC seeks the
proposing firm’s best proposal with the initial submittal. However, FKACC may
enter into discussions/negotiations of the proposals and/or request
Best-And-Final Offers as many times as necessary and from whichever firms it
selects, but is not obligated to do so. FKACC may determine the firm(s) to be
recommended for contract award at any point in any phase of the selection
process, without going to the next phase of selection. FKACC may also remove
proposing firms from consideration at any point during the process outlined
above in PART III - SUBMITTAL REQUIREMENTS
RFP responses are to address each of the Submittal
Requirements listed herein. Listed below are the criteria that will be used to
evaluate the RFP responses.
FKACC will consider the following key criteria in the
selection process, listed in order of importance:
1. Development Management Approach, with specific emphasis
on FKACC’s
Guiding Principles
2. Project Financing
3. Master Developer’s Relevant Experience
4. Project design and operational features
5. Proposed Development Management Team
6. Breadth and Depth of Master Developer’s Services and
Resources
7. Additional Information and/or Clarifications, as may be
requested by FKACC
8. Additional Features or Services
PART V - TERMS AND
CONDITIONS OF THE RFP
Definitions
Responding firms are referred to as “Master Developer”,
“Responding Team”, “Responding Firms”, “Firms”, and related terms, used
interchangeably, and shall be defined as the entities providing a response to
this RFP.
General Information
This RFP will in all cases be evaluated as a Request for
Proposal and will not be evaluated as a “Bid” that is awarded solely on the
basis of price or other dollar value.
Communications Regarding this RFP
All communications regarding this Request for Proposals are
to be directed to FKACC’s Coordinator as described in PART I - ADVERTISEMENT:
REQUEST FOR PROPOSALS (RFP). No FKACC Board members or other representatives
are to be contacted.
Delivery of RFP Response
The proposing firm is responsible for delivery of the RFP
response, as outlined herein in
PART I - ADVERTISEMENT: REQUEST FOR PROPOSALS (RFP).
FKACC will not be
responsible for delays caused by the United States Postal Service, private
courier service, or other delay caused by any occurrence. Hard copies of the
RFP response must be submitted. Offers by telephone, facsimile, email, or
telegram will not be accepted. If using an express mail service, be sure to use
FKACC’s street address and zip code - DO NOT USE P. O. BOX number and ZIP CODE.
The RFP due date is firm. Late proposals will be returned to
the proposing firm unopened, and marked “This proposal was received after the
time designated for the receipt and opening of RFP’s.” Responding firms will
not be allowed to withdraw or modify their proposals after the opening time and
date unless invited to do so by FKACC. Upon becoming public information, RFP
files may be examined during normal working hours, by appointment.
Coalition’s Privileges
FKACC reserves the
right to accept or to reject any or all proposals and to make the award to the
proposing firm, who in the opinion of FKACC will be in the best interest of
and/or the most advantageous to the intended residents of the Community and of
the public. FKACC reserves the right to
reject the proposal of any proposing firm which has previously failed in the
proper performance of an award or to deliver on time contracts of a similar
nature or which is not in a position to perform properly under this award. FKACC
also reserves the right to evaluate proposing firm’s performance based on any
references which FKACC may request from other entities. FKACC reserves the right to inspect all
facilities built or operated by proposing firms in order to make a
determination as to the foregoing. The proposing firm’s costs in responding to
this RFP are theirs alone, and FKACC does not accept liability for any such
costs.
Right to Waive and/or Request Revised Proposals
FKACC reserves the right to waive irregularities and
technicalities and to request re-submittals or revised proposals.
RFP Errors
It is the proposing firm’s responsibility to immediately
notify FKACC’s Coordinator, as listed herein in PART I - ADVERTISEMENT: REQUEST
FOR PROPOSALS (RFP) of any error in the RFP submittal discovered subsequent to
the due date.
Conflict of Interest
Each proposing firm
must disclose with its proposal the
name of any officer, director or agent who is also an officer or director of FKACC. Further, each proposing firm must disclose the name of any
Coalition officer or director who owns, directly or indirectly, an interest of
more than five per cent (5%) in the proposing firm, its subsidiaries, branches,
or parent company.
Protests
Any protest concerning any claimed conflict, defect,
unfairness, or ambiguity in this RFP must be filed within 72 hours following
receipt of this RFP. Any protest concerning the award procedures, or intended
award must be filed within 72 hours following notice of FKACC’s intended
decisions concerning selection of the successful proposing firm. Failure to
file a protest within the time prescribed in this paragraph shall constitute a
waiver of the right to contest the provisions of the RFP or of FKACC’s decision
or action.
Inspection of Sealed Proposals
Sealed proposals received by FKACC pursuant to requests for
proposals are exempt from public inspection until FKACC gives notice of a
decision or intended decision, or ten (10) calendar days after proposal
opening, whichever is earlier. RFP files may be examined during normal working
hours by appointment with the FKACC Coordinator.
Public Records
Any material submitted in response to this RFP will become a
public document pursuant to Florida law.
This includes material which the proposing firm might consider to be
confidential or a trade secret. Any claim of confidentiality is waived upon
submission effective after opening.
Legal Requirements
Federal, State, County and local laws, ordinances, rules,
and regulations that in any manner affect the items covered herein apply. Lack
of knowledge by the proposing firm will in no way be a cause for relief from
responsibility.
Contingent Fees
The proposing firm warrants that no person or selling agency
has been employed or retained to solicit or secure a contract herewith for a
commission, percentage, brokerage or contingent fee, excepting bona fide
employees or bona fide established commercial or selling agencies maintained by
the proposing firm for the purpose of securing business. For breach or
violation of this warrant, FKACC shall have the right to annul any resulting
contract without liability or, in its decision, to deduct from the contract
price without consideration or otherwise recover the full amount of such
commissions, percentage, brokerage or contingent fee.
Equal Opportunity
FKACC encourages the participation of local providers and Minority/Women Business Enterprises (M/WBE), in
all contracts, subcontracts and joint ventures associated with this project. No
person or firm shall be excluded from participation in, denied the benefits of,
or otherwise discriminated against in conjunction with the awarding and
performance of any FKACC procurement on the basis of race, color, religion,
national origin, age, sex, disability, sexual orientation, or marital status.
FKACC is committed to actively soliciting bids from
businesses owned by minorities and women as well as from businesses that make
good faith efforts to provide business opportunities to subcontractors that are
owned by minorities and women. FKACC strongly encourages women-owned and
minority business enterprise participation in this project.
Additionally, FKACC encourages all proposing firms to make a
good faith effort to provide opportunities to women and minority-owned
businesses and to commit a portion of the contracted amount to capable M/WBE
businesses. FKACC does not require,
however, a percentage of M/WBE’s participation for this project.
Public Entity
A person or affiliate who has been placed on the convicted
vendor list following a conviction for a public entity crime may not submit a
bid on a contract to provide any goods or services to a public entity, may not
submit a bid on a contract with a public entity for the construction or repair
of a public building or public work, may not bid on leases or real property to
a public entity, may not be awarded or perform work as a contractor, supplier,
subcontractor, or consultant under a contract with any public entity in excess
of the threshold amount provided in Section 287.017, for CATEGORY TWO for a
period of thirty-six (36) months from the date of being placed on the convicted
vendor list.
Right to Select More Than One Master Developer
FKACC reserves the right to select more than one Master
Developer under this RFP and/or modify the scope of services to be provided by
any Master Developer(s) engaged under this RFP.
Non-Exclusivity of Development Management Team Members
FKACC desires the ability to switch team members, supporting
firms, subcontractors, tenants or other participating entities from one
submitting firm to another or to replace proposed team members, supporting
firms, subcontractors, tenants or other participating entities with
Coalition-selected consulting firms, subcontractors, or other participating
entities.
A condition of FKACC accepting proposals will be that the
proposal contains no exclusive agreements between the submitting firm and any
team members, supporting firms, subcontractors, tenants or other participating
entities regarding this project. FKACC
reserves the right, however, to
consider, in its sole discretion, submissions that include exclusive
relationships, provided that the relationship is ongoing and there is a history
of substantial projects completed under the agreement. Any pre-existing
agreements relating to exclusive relationships between team members,
subcontractors, lessors or other participating entities must be fully
documented in the proposal. Such documentation must include past examples of
projects completed under the agreement.
Best and Final Offers/Negotiations
FKACC reserves the right to enter into negotiations with one
or more proposing firms regarding the terms, conditions, finance and any other
elements of the proposals submitted as well as to request best and final offers
from one or more firms as part of the RFP process.
Use of Information Provided by FKACC
FKACC provides the
attached information for use by the proposing firm in gaining a preliminary
understanding of the project. It is the proposing firm’s, and ultimately the
Master Developer’s, responsibility to perform its own due diligence to obtain
and verify the current and accurate information for this project.
Exhibits
List of Exhibits
provided with this RFP:
A. FKACC statement of Vision, Mission and Guiding
Principles.
B. Truman Waterfront Key West, FL Assisted Living Site Plan
C. FKACC Responses to Frequently Asked Questions 8/21/07
D. Key West Assisted
Living Coalition pro forma (5 sheets), “Sources and Uses of Funds” (1 sheet),
and 28-
page Market
Study dated May 2005, all prepared by Haskell.
E. “Phase Two Summary of Findings”, 20-page PowerPoint copy.
F. 99 Year Lease
between the City of Key West and the FKACC
G. Project Timeline
H. Reference
H.A.R.C. Guidelines http://www.keywestcity.com/egov/docs/1163696580_289123.pdf
For an overall project time line click here
The list of firms requesting the RFP as of 3-11-2010 are as follows: Nutting Engineers of Florida, Inc. Family Pride Corporation Suffolk Construction Company HLM Holding, LLC Haskell Community Developers Lawson Group Architects, Inc. Astorino Architecture, Engineering Coastal Construction Botsford Builders RF Technologies, Inc. Spears Construction & Consulting, LLC The Evans Group Filben Development Company Michael Miller, Architect Michael Browning, Esquire Cortex, Inc. MIA Consulting Group, Inc.
A Pre-Proposal Conference was held on Wednesday, April 21, 2010 at the Eco Discovery
Center in Key West. For a three page list of attendees click here.
Anyone may obtain a transcript of the Pre-Proposal Conference by contacting: Cathy Webster, Court Reporter, at cwebkw@bellsouth.net .
|